Dark Mode
  • Saturday, 07 November 2026

Kalyan-Ulhasnagar connectivity: Rs 326 crore Shahad ROB project gets work order, construction to begin soon

The Shahad railway overbridge reconstruction project is set to begin soon, following the issuance of a work order. This Rs 325.93-crore project aims to construct two new two-lane bridges to replace the existing structure. The first phase involves building a new bridge alongside the current one while minimizing traffic disruption during construction. Upon completion, the project will improve connectivity between Kalyan, Ulhasnagar, and Murbad significantly.

Comment / Reply From